Airframe Profile
VH-ZND 787-9
787-9 Dreamliner | 787-9
No current tracking data.
Operator Journey
Operators
Returned to Service following checks
Damaged in Tornado at Brisbane Airport Aircraft grounded for structural checks
Aircaft was the first ever aircraft to perform PER-LHR non stop.
Returned to service following checks
Whilst performing flight QF-10 from London Heathrow to Perth, the aircraft departed Heathrow's runway 27R when the crew received an indication the tail had contacted the runway surface. The crew stopped the climb at 6000 feet, entered a hold to dump fuel and returned to Heathrow for a safe landing on runway 27L about 55 minutes after departure. A post flight inspection revealed both tail strike sensors had triggered. Qantas confirmed the aircraft returned to Heathrow following a suspected tail strike. Engineers inspected the aircraft and found no damage to the fuselage. The flight needed to be cancelled nonetheless due to crew duty time limitation. The occurrence aircraft is still on the ground in Heathrow about 26 hours after landing back. At the time of departure and landing back Britain was under the influence of winter storm Ciara. The B787?s have tail strike indication systems. Boeing described that system: "The tail strike alert system detects ground contact which could damage the airplane pressure hull. A two-inch blade target and two proximity sensors are installed on the aft body of the airplane. The EICAS caution message TAIL STRIKE is displayed when a tail strike is detected. This indication is accompanied by a beeper and Master CAUTION light."
Whilst performing flight QF-10 from London Heathrow to Perth, the aircraft departed Heathrow's runway 27R when the crew received an indication the tail had contacted the runway surface. The crew stopped the climb at 600…
Named Emily Karne Kngwarreye
New aircraft - Delivered to airline
Named Skippy
Painted in "Indigenous - Yam Dreaming" Livery
First Flight
Rolled out (New Aircraft)
Powered by General Electric Engines
Built at Everett
Entered Final Assembly
Assigned as ZB272
Build Type - Production Standard
Keep Exploring